Archive for the 'interior' Category
March 6, 2007
Posted in interior | Leave a Comment »
March 6, 2007


exhibition area to the end of the building and before get picked up for factory tour.
Posted in interior | Leave a Comment »
March 6, 2007

retail area with 30m long ms. steel shelf separating corridor with retail shop but at the same time allows for views inside the shop as well as displayed items on the shelve.
Posted in interior | Leave a Comment »
March 6, 2007

purple rain, reflection, translucence, illusion. conceptual design for a bar 1999
Posted in interior | Leave a Comment »
March 6, 2007
Posted in interior | Leave a Comment »
February 22, 2007
Posted in interior | Leave a Comment »
February 22, 2007


Brown powder coated aluminium louvers at balcony area and face concrete slab ceiling with frame-less clear glass.
www.zlgdesign.com
Posted in interior | Leave a Comment »
February 22, 2007



New added guest bedroom com bath pavilion in row face concrete and frame-less glass windows.
Posted in interior | Leave a Comment »
February 22, 2007



The interior of the retail, public corridor and F+B of Boh visitor center completed 2005. mainly using ms. steel for the shelf allowing transparent view from corridor and inside retail area. F+B food counter needed to reflect the corporate colors of Boh.
www.zlgdesign.com
Posted in interior | Leave a Comment »
February 22, 2007



Office interior for telecommunication Digi headquarter in Subang completed 2006. Corridors in their simplicity using bamboo and wood and a stainless steel bar reflecting the outdoor stone walls into the inside of the lounge space.
Posted in interior | Leave a Comment »